← Program watch
United States / Air & Space

B-21 Raider

US Air Force bomber program with reported flight-test progress, production-capacity expansion and a newly activated integration unit, while arrival at its first operating base remains a future milestone in the reviewed evidence.

DOCUMENTED STAGEFlight testing and base-integration preparationEvidence through 14 Sept 2026Sources reviewed 4 Oct 2026
THE DEVELOPMENT RECORD

Milestones, with receipts.

Second flight-test aircraft arrives

The Air Force reported a second aircraft joining the Edwards test campaign, expanding evaluation and maintenance experience.

Read the source ↗

Production-capacity agreement announced

The Air Force announced an agreement to expand capacity. Its stated 2027 Ellsworth arrival target was a plan, not a completed delivery.

Read the source ↗

Combined test flight reported

Edwards reported an operational test pilot flying with a developmental test pilot. This entry uses the announcement date because the exact flight date was not specified.

Read the source ↗

Ellsworth arrival target reaffirmed

An Air Force report posted on 29 July, covering General Dale White's 27 July address, repeated the target for aircraft at Ellsworth in 2027. It also reported test and production progress; the arrival remained a future target.

Read the source ↗

Integration detachment activated at Ellsworth

The Air Force established B-21 Integration Detachment 1 to coordinate integration of the aircraft. The official photo record was posted on 14 September and dates the ceremony to 9 September; establishing the unit does not establish aircraft delivery or operational acceptance.

Read the source ↗
SOURCE REGISTER

Read the evidence.

  1. 01
  2. 02
    B-21 production-capacity agreementUS Air Force · 23 Feb 2026
  3. 03
    Operational pilot flies B-21Edwards Air Force Base · 11 Jun 2026
  4. 04
    We Are the Ember: Gen. Dale White Demands Speed on Air Force ProgramsAir Force Life Cycle Management Center / DVIDS · 29 Jul 2026
  5. 05